Home > news   > News Detail

Seawater Reverse Osmosis (SWRO) Pre-Filtration in Ras Al Khair, Saudi Arabia

2026-10-31

1. Project Background

Located on the Arabian Gulf coast at Ras Al Khair, Saudi Arabia, one of the world's largest Seawater Reverse Osmosis (SWRO) desalination plants produces over 600,000 m³ of potable water daily. The facility abstracts raw seawater from the shallow Arabian Gulf at a continuous rate of 55,000 m³/h. Gulf seawater exhibits high salinity ($TDS > 45,000\text{ mg/L}$), elevated summer temperatures ($> 38^\circ\text{C}$), high silt density index (SDI), and frequent red tide events caused by dinoflagellate blooms.

Raw seawater passes through coarse intake screens before entering primary clarification and secondary fine filtration prior to cartridge filters and high-pressure SWRO membrane racks. The original dual-cell gravity sand filters were vulnerable to severe solids breakthrough during red tides, clogging fine cartridge filters within hours and fouling SWRO membranes. To safeguard the multi-million-dollar SWRO membrane asset and ensure continuous municipal water supply, the plant owner partnered with LEFILTER to install an automated high-flow primary pre-filtration barrier.

2. Customer Pain Points

3. LEFILTER Customized Solution

LEFILTER engineered a ultra-high-capacity primary seawater filtration complex comprising twelve skid-mounted LEFILTER LF-BS Series Automatic Scraping Backwash Filters fabricated from 254 SMO super-austenitic alloy.

4. Technical Operational Results

Following 24 months of continuous operation at the Ras Al Khair desalination plant, the LEFILTER primary pre-filtration system delivered outstanding performance metrics:


News recommendation