1. Project Background

Located in the arid Kyzylkum Desert region of Zarafshan, Navoiy Region, Uzbekistan, a major open-pit gold mining and hydrometallurgical processing plant operates a continuous carbon-in-leach (CIL) circuit with a total process water circulation capacity of 3,200 m³/h. The process water loop recycles barren cyanide solution and decant water from tailing storage facilities (TSF). The circulating fluid is heavily laden with ultra-fine silica dust, residual iron cyanides, calcium sulfate scale precursors, and abrasive gold-bearing ore micro-slurry.

The mining complex operates in an extreme climate where summer temperatures exceed 45°C, making raw river water abstraction from the Amu Darya river strictly regulated under Uzbekistan's national environmental quotas. The facility originally relied on bank-mounted duplex bag filtration assemblies to protect downstream heat exchangers, high-pressure elution column pumps, and electrowinning cell spray nozzles. However, the abrasive micro-slurry caused severe operational bottlenecks, leading the mine operator to seek an automated, continuous filtration upgrade from LEFILTER to stabilize gold recovery rates and maintain environmental compliance.

2. Customer Pain Points

3. LEFILTER Customized Solution

LEFILTER’s international metallurgical engineering team developed a complete, automated filtration skid featuring four parallel LEFILTER LF-FC Series Multi-Chamber Automatic Backwash Filters engineered specifically for aggressive chemical environments.

4. Technical Operational Results

Following 18 months of continuous operational monitoring at the Zarafshan gold plant, the LEFILTER LF-FC multi-chamber backwash system achieved exceptional technical and financial performance metrics: